Commercial

/Commercial

New Hanover County Juvenile Justice Facililty

New three-story Juvenile Justice court facility on site in downtown Wilmington located at 138 N 4th street. The building includes Courtrooms, holding cells, vehicle sallyport, and general office spaces, and will be primarily steel frame construction with some cast-in-place foundation walls and concrete masonry shafts and security walls. Contract Amount: $13.4M Completion: January, 2021

ABC Wrightsville

This 8,000 sf, new construction facility is located just off Wrightsville Beach, and replaced an existing store in the area. A mix between beachy and industrial, we partnered with Smith2 Architecture + Design and the New Hanover County ABC Board to achieve an updated look that reflected the surrounding area. Retail space for the new [...]

Grace United Methodist Church

Grace United Methodist Church was established in 1797 and continues to be one of the most prestigious churches in North Carolina today. The congregation touches the community through many outreach aspects and helps to advocate for spiritual growth for all. Having renovated and rebuilt after several fires, and withstood the Civil War, the church remains [...]

Pine Valley Library

The Pine Valley branch library in Wilmington, NC is a new 19,500 sf state-of-the-art facility boasting a variety of modern design elements. The façade includes a variety of metal wall panels, storefront and curtainwall, and tongue-and-groove wood ceilings and soffits that provide a continuous flow between interior and exterior. The interior of the building includes [...]

O2 Fitness Northridge

The O2 Fitness Northridge renovation consisted of the demolition of the existing interior and an upgrade of plumbing, mechanical, electrical, and fire safety systems. Our project team relocated many existing systems to provide a clean ceiling space.  The original drop down ceiling was removed in order to create a new exposed ceiling. In addition, the interior of [...]

BDO Raleigh Office Upfit

Fast-track tenant improvement for BDO USA LLP's Raleigh office expansion. The project was a full mechanical, electrical, and finish upfit of the 3rd floor of One City Plaza. The renovation required significant night and weekend work to minimize noise and construction impact to adjacent tenants. Located in the epicenter of downtown Raleigh, the project offered [...]

W. Allen Cobb Judicial Annex Veneer Replacement and Improvements

The W. Allen Cobb Judicial Annex was originally constructed in 2002 but suffered significant water intrusion. Bordeaux Construction was contracted to address the significant structural and quality issues while keeping the Annex in full operation. The confines of the site coupled with the building being fully occupied required great care to ensure New Hanover County could [...]

Fayetteville Metropolitan Housing Authority – Early Childcare Center

The facility serves as a Head Start Facility for the children of the local community. Site amenities include concrete curbs, asphalt paving, concrete sidewalks, landscaping, sodding, full irrigation, playground synthetic surfacing and pre-school type playground equipment. Building Exterior is brick veneer wainscot with metal panels above with fixed windows and aluminum storefront. Building interior is [...]

New Hanover County ABC Headquarters

The New Hanover County ABC HQ is a new, 30,000 sf facility serving as offices of the NHC ABC Board as well as the distribution hub for the entire county. The facility is a blend of conventional steel and pre-engineered structure. The pre-engineered warehouse is 20,000 sf complete with loading docks, secure caging storage, and [...]